| Supplement to the Draft Environmental Impact Statement (EIS) |
Type |
|
|
EIS Supplement Response sorted by Proponent
|
PDF 1.2 MB |
|
|
EIS Supplement Response sorted by Topic
|
PDF 1.2 MB |
| Attachments |
| A |
Waste Rock Dump Flux Chart
|
PDF 487.6 KB |
| B |
Waste Rock Dump Design Drainage Evaluation
|
PDF 1.2 MB |
| C |
Comparison Table Between CDA (2007) and ANCOLD (2012) Guidelines
|
PDF 74.9 KB |
| D |
Mt Todd Goldsim Water Balance Model - An Introduction
|
PDF 163.6 KB |
| E |
Preliminary Waste Rock Management Plan Evaluation
|
PDF 221.4 KB |
| F |
Preliminary Feasibility Study - Water Treatment Plant
|
PDF 2.2 MB |
| G |
Fish Passage Requirement
|
PDF 503.2 KB |
| H |
Reporting relating to Air Quality assessment
|
PDF 792.3 KB |
| I |
Responses relation to Surface Water assessment
|
PDF 273.7 KB |
| J |
Revised Regional Vegetation Types between Katherine and Pine Creek
|
PDF 3.3 MB |
| K |
Gouldian Finch Habitat
|
PDF 1.6 MB |
| L |
Surface Water Assessment Hydrology
|
PDF 3.7 MB |