Close

Carpentaria Pilot Project

Opened 26 Mar 2024

Closed 26 Apr 2024

Status

Overview

Imperial Oil & Gas Pty Ltd is proposing the Carpentaria Pilot Program (CPP) for the recovery of petroleum on an appraisal basis at its unconventional gas project on EP 187 (NT Portion 5706) approximately 66km west of Cape Crawford.

The proposal follows on from petroleum exploration and appraisal undertaken within EP 187 since 2019 and will include drilling, stimulation, tie-in of wells and appraisal testing at up to 4 new well pads and 2 existing well pads. It also includes construction of the Carpentaria Gas Plant (CGP) and Water Handling Station (WHS) and the installation of buried gas and wastewater flowlines between well pads, the WHS, and the CGP. The total land disturbance is approximately 226 hectares and the proposed groundwater extraction is up to 950ML over 5 years.

The NT EPA invited public comment on the referral for standard assessment submitted by Imperial Oil & Gas Pty Ltd for the Carpentaria Pilot Project.

For more information about the referral go to the environmental impact assessment register for the Carpentaria Pilot Project.

Back to top