Overview
The Department of Chief Minister and Cabinet is proposing the construction and operation of a common user ship lift, repair and maintenance facility approximately 700m east of the existing East Arm Wharf and Marine Supply Base in Darwin Harbour.
Why we are consulting
Your feedback plays an important role and will be considered by the NT EPA when finalising the environmental impact assessment (EIS) through additional matters to be addressed in a Supplement to the Draft EIS.
Consultation helps the NT EPA and proponent to identify issues of concern and potential effects, as well as get feedback from stakeholders on project options or potential mitigation measures.
The NT EPA has prepared guidance for making a public submission PDF (729.5 KB) that outlines when comments will be sought, how to make an effective comment and what will happen to your comment.
Statutory notice 12 November 2021
The NT EPA invites public comment on the Draft Environmental Impact Statement (Draft EIS) for the construction and operation of a common user ship lift, repair and maintenance facility in Darwin Harbour.
The Draft EIS documents can be inspected and obtained on this web page, and at the following locations:
- Department of Environment, Parks and Water Security / NT EPA, 1st Floor Arnhemica House, 16 Parap Road, Parap NT 0820
- Department of Infrastructure, Planning and Logistics, Level 1 Energy House, 18-20 Cavenagh Street, Darwin, NT 0800
- Environment Centre Northern Territory, Unit 3, 98 Woods Street, Darwin, NT 0800
- Northern Land Council, 45 Mitchell Street, Darwin NT 0800
- Northern Territory Library, Parliament House, Darwin, NT 0800
Interested persons may make a submission by 14 January 2022. All submissions will be treated as public documents unless confidentiality is requested. The NT EPA publishes this notice in accordance with regulation 133 of the Environment Protection Regulations 2020 PDF (758.0 KB).
Documents
Draft environmental impact statement | Type |
---|---|
Executive summary | PDF 705.0 KB |
Table of contents | PDF 41.3 KB |
Environmental impact statement | PDF 6.7 MB |
Appendices | Type |
---|---|
Appendix A terms of reference | PDF 115.2 KB |
Appendix B persons involved in EIS | PDF 155.0 KB |
Appendix C social impact assessment | PDF 4.2 MB |
Appendix D risk assessment | PDF 327.3 KB |
Appendix E water quality | PDF 1.6 MB |
Appendix F benthic habitat modelling | PDF 3.8 MB |
Appendix G underwater noise | PDF 1.4 MB |
Appendix H geochemical sediment assessment | PDF 5.8 MB |
Appendix I sediment transport modelling | PDF 5.0 MB |
Appendix J air quality and greenhouse gas | PDF 3.5 MB |
Appendix K terrestrial noise impact assessment - 6 December 2021 | PDF 6.4 MB |
Appendix L traffic impact assessment | PDF 2.3 MB |
Appendix M cultural heritage assessment | PDF 4.9 MB |
Appendix N preliminary site investigation | PDF 9.2 MB |
See Darwin Ship Lift and Marine Industries Project for more information.