Proponent: INPEX Operations Australia Pty Ltd (INPEX)
Overview
INPEX Operations Australia Pty Ltd are proposing the construction, commissioning, operation and decommissioning of a ~12 km carbon dioxide (CO2) export pipeline to tie in stations on Middle Arm, and hot commissioning and operation of the Ichthys LNG facility CO₂ compression and export system and upgraded acid gas removal units.
The proposal is associated with other carbon capture and storage (CCS) proposals being:
- INPEX Operations Australia Pty Ltd - Ichthys LNG AGRUs Upgrades and CCS Preparedness Project
- INPEX Operations Australia Pty Ltd - Bonaparte Carbon Capture and Storage Project
While each proposal is being assessed separately under the Environment Protection Act 2019 the NT EPA will consider direct, indirect and cumulative environmental impacts across all three proposals. As such, it is proposed to align the timing of the assessment process for the three proposals where possible.
Stakeholders will be able to participate in the assessment process by providing comments on either (i) each of the proposals individually, or (ii) via a single submission addressing all three proposals.

Figure 1: INPEX associated carbon capture and storage proposals
Expanded figure 1 - INPEX associated carbon capture and storage proposals PDF (641.5 KB)
Note: the Bonaparte Carbon Capture and Storage Project assessment under the Environment Protection Act extends to the NT coastal waters limit.
Stage 1: Referral
NT EPA notices
Documents
| Referrals | Type |
|---|---|
| Referral Form | PDF 1.0 MB |
| Referral report (including Appendix E and Appendix F) | PDF 7.8 MB |
| Appendix A - EPBC Act protected matters search | PDF 248.7 KB |
| Appendix B - Likelihood of occurrence assessment | PDF 849.7 KB |
| Appendix C - Ichthys carbon capture and storage stakeholder engagement plan | PDF 1.0 MB |
| Appendix D - Pre-referral consultation | PDF 1.9 MB |
| Appendix E – Preliminary screening assessment – NT EPA environmental factors or values (included in Referral Report) | |
| Appendix F – Preliminary assessment – significant impacts to EPBC Act MNES (included in Referral Report) |
Public consultation
The NT EPA published a statutory notice on 12 January 2026 to invite public comment on the referral for standard assessment submitted by INPEX Operations Australia Pty Ltd for the Ichthys Carbon Capture and Storage Project located in Bladin Point in the Greater Darwin area.
Interested persons were invited to make a submission by 10 February 2026. The NT EPA published the notice in accordance with regulation 52(1) of the Environment Protection Regulations 2020.
The following submissions are published in accordance with regulation 267 of the Environment Protection Regulations 2020.
| Submissions received on the referral | Type | |
|---|---|---|
| Government authority submissions | ||
| 1 | Aboriginal Areas Protection Authority | PDF 489.7 KB |
| 2 | Department of Climate Change, Energy, the Environment and Water | PDF 206.6 KB |
| 3 | Department of Logistics and Infrastructure | PDF 40.3 KB |
| 4 | Department of Lands, Planning and Environment | PDF 544.6 KB |
| 5 | NT Health – Environmental Health Strategy | PDF 100.4 KB |
| 6 | NT Health – Medical Entomology section | PDF 41.9 KB |
| Public submissions | ||
| 7 | BirdLife Top End | PDF 4.2 MB |
| 8 | Environment Centre Northern Territory | PDF 229.2 KB |
| 9 | Eric Smith | PDF 45.7 KB |
| 10 | Grusha Leeman | PDF 196.2 KB |
| 11 | Heather Ferguson | PDF 104.6 KB |
| 12 | Institute for Energy Economics and Financial Analysis | PDF 149.7 KB |
| 13 | Justin Tutty | PDF 52.1 KB |
| 14 | Melissa Ball | PDF 92.3 KB |
Stage 2: Assessment
Draft Terms of Reference
Documents
| Draft terms of reference | Type |
|---|---|
| Draft terms of reference for an EIS - EP2025/049 - 21 May 2026 | PDF 612.2 KB |
Public consultation
Please refer to NT EPA open consultations.