Close

Proponent: Power and Water Corporation (NT)

Overview

Power and Water Corporation (NT) proposes to return the existing Manton Dam reservoir to service as a water supply reservoir for the greater Darwin region. The proposal includes the construction, upgrade and operation of infrastructure at Manton Dam, a new water pipeline along the Stuart Highway, and a new water treatment plant at Strauss, plus the ongoing extraction and treatment of water.

Stage 1: Referral

NT EPA notices

Public consultation on the referral

Statutory notice (1 November 2023)

The NT EPA published a statutory notice on 1 November 2023 inviting public comment on a referral for standard assessment submitted by Power and Water for the Manton Dam Return to Service Project.

Interested persons were invited to make a submission by 29 November 2023. The NT EPA published the notice in accordance with regulation 52(1) of the Environment Protection Regulations 2020.

Documents

Referral Type
Referral Form PDF 13.7 MB
Referral Report PDF 5.0 MB
Referral Report Appendices B to L PDF 15.9 MB
Back to top