Supplement to Environmental Impact Statement |
Type |
|
Main Report
|
PDF 3.6 MB |
Appendices |
A |
Geochemical Baseline Study and Site Conceptual Model
|
PDF 22.5 MB |
B |
Site Flood Assessment
|
PDF 11.2 MB |
C |
Groundwater Modelling
|
PDF 9.7 MB |
D |
Flora and Fauna Survey
|
PDF 6.0 MB |
E |
Aquatic Ecosystem Survey
|
PDF 7.7 MB |
F |
Update Site Specific Trigger Values
|
PDF 434.7 KB |
G |
Commitments Summary Table
|
PDF 878.5 KB |
H |
Risk Assessment Framework
|
PDF 1.5 MB |
I |
Acid and Metalliferous Drainage Management Plan
|
PDF 31.0 MB |
J |
Mine Closure Plan
|
PDF 4.3 MB |
K |
Site Water Balance
|
PDF 742.1 KB |
L |
Water Management Plan
|
PDF 14.5 MB |
M |
NT EPA Correspondence on Draft EIS
|
PDF 549.7 KB |
N |
Assessment of EPBC 1999 Referral
|
PDF 1.1 MB |
O |
Tailing Storage Facility Conceptual Geotechnical Options Study
|
PDF 2.1 MB |