Supplement to Environmental Impact Statement |
Type |
|
Main document
|
PDF 18.4 MB |
Appendices |
1 |
Draft Monitoring Plan
|
PDF 5.0 MB |
2 |
Surface and groundwater quality data
|
PDF 4.4 MB |
3 |
Hydrobiology 2013a Environmental values downstream
|
PDF 3.3 MB |
4 |
Hydrobiology 2016a floodplain tailings investigation
|
PDF 12.2 MB |
5 |
Hydrobiology 2016b aquatic ecosystem survey
|
PDF 3.1 MB |
6 |
O'kane's 2015a Rum Jungle new waste storage facility simulation
|
PDF 2.0 MB |
7 |
O'kane's 2015b waste placement and advective airflow
|
PDF 1.1 MB |
8 |
O'kane's 2015c contaminant loading
|
PDF 1.7 MB |
9 |
O'kane's 2015d Dyson's backfilled pit cover
|
PDF 2.4 MB |
10 |
SLR Consulting 2020a waste storage facility erosion assessment
|
PDF 10.3 MB |
11 |
SLR Consulting 2020b cover options analysis
|
PDF 2.8 MB |
12 |
SLR Consulting 2020c lime applications
|
PDF 1.3 MB |
13 |
SLR Consulting 2020d waste storage facility site selection
|
PDF 1.9 MB |
14 |
SLR Consulting 2020e growth medium for waste storage facility capping
|
PDF 2.3 MB |
15-A |
Rum Jungle Geotechnical Report – Part A
|
PDF 22.0 MB |
15-D |
Rum Jungle Geotechnical Report – Part D
|
PDF 21.7 MB |
15-E |
Rum Jungle Geotechnical Report – Part E
|
PDF 32.4 MB |
15-F |
Rum Jungle Geotechnical Report – Part F
|
PDF 28.1 MB |
15-G |
Rum Jungle Geotechnical Report – Part G
|
PDF 28.0 MB |
16 |
Traffic impact assessment
|
PDF 13.0 MB |
17 |
East branch Finnis River diversion design report
|
PDF 4.3 MB |
18 |
Erosion sediment control measures
|
PDF 2.8 MB |
19 |
Water treatment plant design report
|
PDF 3.8 MB |
20 |
Waste storage facility construction and general site civil works
|
PDF 21.8 MB |
21-A |
Main pit remediation strategy - Part A
|
PDF 29.0 MB |
21-B |
Main pit remediation strategy - Part B
|
PDF 31.7 MB |
21-C |
Main pit remediation strategy - Part C
|
PDF 25.1 MB |
21-D |
Main pit remediation strategy - Part D
|
PDF 30.0 MB |
21-E |
Main pit remediation strategy - Part E
|
PDF 26.3 MB |
23 |
Final landform design drawings
|
PDF 9.5 MB |
24 |
Reinstatement of East branch Finnis River design drawings
|
PDF 10.0 MB |
25 |
Main pit design drawings
|
PDF 7.3 MB |
26 |
Borrow area drawings
|
PDF 7.1 MB |
27 |
Rum Jungle Revegetation Strategy Framework
|
PDF 3.1 MB |
28-A |
Groundwater flow transport model: Current conditions – Part A
|
PDF 29.6 MB |
28-B |
Groundwater flow transport model: Current conditions – Part B
|
PDF 16.7 MB |